Campus Appearance Phase I

January 2004

Last academic year, the ad-hoc Campus Appearance Committee reviewed and prioritized an initial list of 34 potential projects consisting of small grounds items or issues that, if addressed, would have an immediate impact on the attractiveness of the campus.

The first 15 projects in Group I and five additional projects in Group II have now been completed, and "after" photos of the projects showing the impact are provided below..  The remaining projects in Group III, which have not been prioritized and are not listed in a particular order, are still under consideration as part of the Strategic Planning effort.

Group I - Prioritized projects 1-15:            Group II   |   Group III

Priority

Description

Before

After

1.

Remove Garbage Containers Campus-wide, Install Compactor

2.

Remove Posts & Chains Campus-wide

3.

Install Ground Cover and Pathway with Decorative Fence at Parking Deck

4.

Replace Trash Containers and Cigarette Urns

5.

Repair Concrete at Laurel Hall

6.

Install Decorative Fence and Replant Ground Cover at Laurel Hall

7.

Install Tree Grates on Summit St.

8.

Replace Ground Cover and Plantings, GITC Entrance at Central Ave

9.

Remove Bus Stop on Summit St., Install Bike Rack

10.

Replace 2 Signs at Athletic Field and at GITC

11.

Remove 2 Signs and Replant Area at Electrical and Computing Engineering Building

12.

Remove Fence at Tiernan Lot 5 and Warren Street and Specht

13.

Install Concrete Walkway at Cypress Hall

14.

Construct Concrete Pad for Existing Bench - West Green

15.

Replace Ground Cover at Microelectronics on Summit St.